Valve Body RFQ
Valve Body Leak-Test and CMM RFQ Checklist
Valve body RFQs can fail when suppliers quote the body shape but do not quote the same port, thread, sealing, leak-test, and inspection assumptions. Use this checklist before supplier comparison.
Minimum Package
What to include before asking for price
Quote-Sensitive Features
Features that change supplier assumptions
Supplier Questions
Questions buyers should ask before comparing valve body quotes
Review leak-test, thread, and CMM assumptions before pricing
Bohua can review a non-confidential valve body package and separate casting blank, CNC machining, leak-test, port/thread inspection, and CMM reporting assumptions before supplier comparison.
Send valve body packageFAQ
Valve body RFQ questions
Why does a valve body RFQ need leak-test and CMM details?
Valve body quotes can vary widely when suppliers assume different port, thread, sealing, leak-test, and CMM scopes. Defining these before pricing makes supplier comparison more reliable.
What inspection records should be requested?
Common records include CMM report, thread-gauge results, material certificate, FAI, PPAP checklist, leak-test record, and buyer-specific traceability fields. The exact records should match the application and approval process.
Can Bohua review a valve body package before a full quote?
Yes. Bohua can review a non-confidential drawing or summary to identify quote-sensitive assumptions around casting blank, CNC machining, leak-test, thread inspection, and CMM reporting.