Home/Resources/Valve Body Checklist

Valve Body RFQ

Valve Body Leak-Test and CMM RFQ Checklist

Valve body RFQs can fail when suppliers quote the body shape but do not quote the same port, thread, sealing, leak-test, and inspection assumptions. Use this checklist before supplier comparison.

Minimum Package

What to include before asking for price

2D drawing and revision status
STEP or 3D model when available
Material or alloy requirement
Annual volume or batch quantity
Port and thread standards
CNC machining scope and deburring requirements
Leak or pressure-test requirement
CMM, thread-gauge, material certificate, FAI, or PPAP records
Any impregnation, repair, porosity, or cleanliness policy

Quote-Sensitive Features

Features that change supplier assumptions

Port location and thread gauge requirement
Sealing face flatness and surface finish
Machined cavity, bore, or spool alignment
Wall thickness around pressure zones
Thread depth and burr-control requirement
Leak-test pressure, medium, hold time, and acceptance criteria
CMM datum and report format
Plugging, cleaning, and packaging requirements

Supplier Questions

Questions buyers should ask before comparing valve body quotes

Are all ports and threaded features included in CNC scope?
Is thread-gauge inspection included?
Is leak or pressure testing included, sampled, or excluded?
What CMM datum and report format are assumed?
What porosity, impregnation, or repair policy is allowed?
Are cleaning and deburring requirements included?
Which features drive tooling, fixture, or inspection cost?

Review leak-test, thread, and CMM assumptions before pricing

Bohua can review a non-confidential valve body package and separate casting blank, CNC machining, leak-test, port/thread inspection, and CMM reporting assumptions before supplier comparison.

Send valve body package

FAQ

Valve body RFQ questions

Why does a valve body RFQ need leak-test and CMM details?

Valve body quotes can vary widely when suppliers assume different port, thread, sealing, leak-test, and CMM scopes. Defining these before pricing makes supplier comparison more reliable.

What inspection records should be requested?

Common records include CMM report, thread-gauge results, material certificate, FAI, PPAP checklist, leak-test record, and buyer-specific traceability fields. The exact records should match the application and approval process.

Can Bohua review a valve body package before a full quote?

Yes. Bohua can review a non-confidential drawing or summary to identify quote-sensitive assumptions around casting blank, CNC machining, leak-test, thread inspection, and CMM reporting.